By-Law 38 at this link stipulates the conditions for installing an Electric Vehicle charging station and the processes to be followed by the Owner to obtain approval and for installation. Tenants are not permitted to apply directly.
To ensure consistency of instalation practices, instalation of EV infrastructure and connection of an EV charger can only be carried out by the Owners Corporation nominated contractor. You should make arrangements direct with the contractor. The current approved contractor is:
The currently approved list of EV Chargers which are compatible with the EV Charging infrastructure is:
Check with the approved contractor for specific model numbers.
Please complete all fields